Click to Home

Go To Search
Highway Division
Contacts
Jon Elie
Operation's Manager

Dick Morin
District II Team Manager

Steve Murch
City Arborist/Traffic Supervisor

Michael Bernier
Parks/Athletic Fields Team Manager

Marcel Roy
District I Team Manager

103 Adams Ave.
Lewiston, ME  04240

Ph: (207) 513-3003
Ph: (207) 513-3007 TT/DID
Fax: (207) 784-5647

Hours
Monday - Friday
7:00 am - 3:00 pm
FYI:  2016 Lisbon Street Work Schedule

5/5/16 LISBON STREET PROJECT UPDATE:  The contractor will be working nights next week beginning Sunday, May 8th. Work is anticipated to include:

Installing storm drain on Ash Street from Lisbon Street to the Canal and on Lisbon Street from Ash Street to Rainbow Bicycle

Removing cobblestones and placing pavement in these locations

Milling Lisbon Street from Chestnut Street to Main Street (Currently Scheduled for the night of May 10th)

It is anticipated that there will be a depression of approximately one to one and a half inches in the areas the cobblestones were located from the time they are removed until the milling is completed.

In addition to the above-work planned by the contractor the City of Lewiston Water and Sewer Division will be closing Lisbon Street between Pine Street and Ash Street between 4:00 AM and 7:00 AM to facilitate lowering sewer manholes located in the intersection. During the time of the closure a detour will be established utilizing Pine Street, Bates Street, and Ash Street.

This schedule is subject to change due to weather and other unforeseen events; additional information will be provided as it is received.

Responsibilities & Services
The Highway Division is the largest division in Public Works and maintains the city’s road and storm drainage systems, green spaces, trees and landscape areas, and manages ice and snow during Winter Operations.

The City of Lewiston has more than 188 miles of roads, 86 miles of sidewalk, eight bridges, and numerous miles of roadside ditches and underground storm drainage systems, all of which the Highway Division is responsible for maintaining. The most visible efforts are street paving in the summer and snow plowing in the winter.

Division Organization
The Highway Division is made up of four maintenance teams.  Two teams are assigned geographical areas of the City, better known as districts and are tasked with maintaining the streets, sidewalks and storm drainage systems with their assigned areas.  These districts, better known as District I and District II are separated by Sabattus St. and East Ave.  District I covers the northwest side and District II the southeast side of the Sabattus St. - East Ave. boundary line.  Trees, Landscaping, parks, cemeteries, athletic fields, and green spaces are managed by the City Arborist and the Parks/Athletic Fields Team Manager in overlapping districts.

A map showing the two highway districts is available for download from our download files section below.

 Additional Resources

 


27 Pine Street
Lewiston, ME 04240
Ph: (207) 513-3000
TTY/TDD: (207) 513-3007
Contact Us